Efisiensi Biaya Dan Waktu Menggunakan Metode Crashing Pada Proyek Saluran Air Kotor Kelurahan Dermo

Aziz, Juang KebenaranHaqiqi Abdul (2022) Efisiensi Biaya Dan Waktu Menggunakan Metode Crashing Pada Proyek Saluran Air Kotor Kelurahan Dermo. Skripsi thesis, Universitas Kadiri.

[img] Text
Cover.pdf

Download (164kB)
[img] Text
Abstrak.pdf

Download (154kB)
[img] Text
Bab 1.pdf
Restricted to Repository staff only

Download (287kB)
[img] Text
Daftar Pustaka.pdf

Download (273kB)

Abstract

In the process of building a construction project, work delays often occur on the project. So we need an alternative that can be used to support the acceleration of project completion. In this study, we will analyze the acceleration of the duration of the construction project for the Dirty Drainage in Dermo Village, Kediri, with the alternative of adding three hours of work. The total project cost budget in the post-crashing condition with the alternative of adding three hours of work is Rp. 91,883,968,44 or more expensive 3.86% of the total project budget in normal conditions and the duration of project implementation is 22 working days or faster 26.67% of the normal duration. It can be concluded that by implementing a system of adding three hours of work hours is a more effective alternative to crashing, because the duration is faster. Keywords: Crashing, Delay, Project Acceleration, Duration

Item Type: Thesis (Skripsi)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > Prodi Teknik Sipil S1
Depositing User: Unnamed user with email rio.mahardiko@gmail.com
Date Deposited: 07 Oct 2023 02:38
Last Modified: 07 Oct 2023 02:38
URI: http://repository.unik-kediri.ac.id/id/eprint/655

Actions (login required)

View Item View Item