Analisa Percepatan Proyek Menggunakan Metode Time Cost Trade Off (Studi Kasus : Proyek Pembangunan IGD, Instalasi Farmasi, Laboratorium dan Ruang Inap RS. Bhayangkara Nganjuk)

Hermawan, Muhammad Rizal (2021) Analisa Percepatan Proyek Menggunakan Metode Time Cost Trade Off (Studi Kasus : Proyek Pembangunan IGD, Instalasi Farmasi, Laboratorium dan Ruang Inap RS. Bhayangkara Nganjuk). Skripsi thesis, Universitas Kadiri.

[img] Text
Halaman Awal.pdf

Download (1MB)
[img] Text
Abstrak.pdf

Download (15kB)
[img] Text
Bab 1.pdf
Restricted to Repository staff only

Download (205kB)
[img] Text
Daftar Pustaka.pdf

Download (199kB)

Abstract

Project management is one of the things that has an effect in the smooth work of construction projects. Time and cost management is the benchmark in the successful implementation of the project. In the construction project of Bhayangkara Nganjuk Hospital, it includes construction work on IGD, Pharmaceutical Installation, Laboratory and Hospital Inpatient Room. Bhayangkara Nganjuk is indicated to have experienced delays due to unfaithful weather conditions. The delay will have an impact on the costs that will be incurred. The purpose of this research is to make an alternative time acceleration on the project by using the time cost trade off method. Acceleration is done by implementing a work shift system so that the results of time and cost are obtained after the work shift system is applied. The results of the study obtained the total cost after the acceleration of Rp. 3,873,505,632.00 the value is more expensive 11.25% than the normal cost of the project of Rp 3,481,698,000.00. With an acceleration duration of 125 days or 25.71% faster than the normal duration of the project of 180 days. From these results it is necessary to reconsider with the increase in the total cost of the project and the duration that has been done. Keywords: Project Acceleration, Time Cost Trade Off, Work Shift, Microsoft Project

Item Type: Thesis (Skripsi)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > Prodi Teknik Sipil S1
Depositing User: NR Nurul Huda
Date Deposited: 25 Feb 2022 02:34
Last Modified: 25 Feb 2022 02:34
URI: http://repository.unik-kediri.ac.id/id/eprint/297

Actions (login required)

View Item View Item