Pengendalian Biaya Dan Waktu Pada Proyek Pembangunan Gedung 3 Lantai Desa Tugurejo Kecamatan Ngasem

Andrianta, Andrianta (2021) Pengendalian Biaya Dan Waktu Pada Proyek Pembangunan Gedung 3 Lantai Desa Tugurejo Kecamatan Ngasem. Skripsi thesis, Universitas Kadiri.

[img] Text
Halaman Awal.pdf

Download (1MB)
[img] Text
Abstrak.pdf

Download (389kB)
[img] Text
Bab 1.pdf
Restricted to Repository staff only

Download (395kB)
[img] Text
Daftar Pustaka.pdf

Download (304kB)

Abstract

How to optimize the acceleration of the duration of the construction project in the 3 Floor Building, Tugurejo Village, Ngasem District, is to add the number of working hours (overtime) from 4 working hours (overtime) to 7 working hours (overtime) thus acceleration the project duration for an optimum 16 days, so that turn around time delays can be minimized. In an efford to accelerate the duration of the 3-story building construction project in Tugurejo Village, Ngasem District, which will require a normal cost of Rp 1.636.731.021 minus the direct costs of work of Rp 1.352.670.265, the duration of the acceleration cost for the 3-story building construction project is Rp 1.636.731.021 – Rp 1.352.731.670.625 = Rp 284.060.756. Key words : Building Construction, Accelaration Project Duration

Item Type: Thesis (Skripsi)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > Prodi Teknik Sipil S1
Depositing User: NR Nurul Huda
Date Deposited: 25 Feb 2022 02:58
Last Modified: 25 Feb 2022 02:58
URI: http://repository.unik-kediri.ac.id/id/eprint/298