Kusuma, Ricky Wahyu (2021) Analisa Keterlambatan Pelaksanaan Pada Proyek Penanganan Longsor Jalan 028.15 Ir. Soekarno Km. 185 Kabupaten Ngawi. Skripsi thesis, Universitas Kadiri.
Text
Halaman Awal.pdf Download (1MB) |
|
Text
Abstrak.pdf Download (212kB) |
|
Text
BAB I.pdf Restricted to Repository staff only Download (398kB) |
|
Text
Daftar Pustaka.pdf Download (343kB) |
Abstract
Every construction project has a certain implementation plan, when the implementation of the project should start, when it should be completed and how the project will be carried out, because of that problems will arise if no plans have been made with the actual reality. The most common occurrence or problem is the delay in project completion. The time delay that has been set by the parties in the agreed contract for the completion of the project. The purpose of this study is to analyze the delay in the implementation of the Road Landslide Handling Project 028.15 Ir. Soekarno Km. 185 Kabupaten Ngawi by identifying the factors that cause delays. The method used to analyze the delay is the Fault Tree Analysis method, which functions to identify each of the factors that cause delays and to find probability values. The probability value obtained from the analysis using the Fault Tree Analysis method is 1,2624 with 4 main events with 16 the basic event cause delay and with 3 dominant basic events has a probability of 0.6 Keyword : Construction project, Delayed, Fault Tree Analysis, Probability
Item Type: | Thesis (Skripsi) |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Teknik > Prodi Teknik Sipil S1 |
Depositing User: | NR Nurul Huda |
Date Deposited: | 21 Apr 2022 06:05 |
Last Modified: | 21 Apr 2022 06:05 |
URI: | http://repository.unik-kediri.ac.id/id/eprint/348 |
Actions (login required)
View Item |