Suwarno, Suwarno (2021) Studi Kelayakan dan Optimalisasi Ruang pada Perencanaan Ruas Jalan Karangan-Tugu Kabupaten Trenggalek.
Text
9. Abstrak Studi Kelayakan dan Optimalisasi Ruang pada Perencanaan Ruas Jalan Karangan-Tugu Kabupaten Trenggalek_Suwarno_2021.pdf Download (48kB) |
|
Text
9. Abstrak Studi Kelayakan dan Optimalisasi Ruang pada Perencanaan Ruas Jalan Karangan-Tugu Kabupaten Trenggalek_Suwarno_2021.docx Download (27kB) |
|
Text
9. BAB I.pdf Restricted to Repository staff only Download (16kB) |
|
Text
9. BAB I.docx Restricted to Repository staff only Download (16kB) |
Abstract
The Central Government has a development plan for this road as part of efforts to promote equality and economic growth in the region. This research involves analyzing the traffic on the existing road and the planned road. Through forecasting methods, the estimated number of vehicles in the future planning year is calculated, taking into account population growth, Gross Regional Domestic Product (PDRB), and per capita PDRB. Analysis is also conducted to determine the percentage of vehicles using the existing road and the new road. The traffic feasibility is evaluated by comparing the Degree of Saturation (Dj) of the existing road with the planned road. Meanwhile, the economic feasibility is analyzed through the operational cost of vehicles (BOK) using the Jasa Marga method and the ND Lea method for motorcycles. The economic feasibility analysis includes calculations of BOK savings, Benefit-Cost Ratio (BCR), and Net Present Value (NPV). This study aims to analyze the feasibility and spatial optimization in the planning of the Karangan-Tugu road section in Trenggalek Regency, East Java. The research findings indicate that the Degree of Saturation (DJ) before the construction of the new road was 0.96 in 2017 and 2.17 at the end of the planned year in 2022, indicating that the existing road is experiencing saturation. On the other hand, the DJ for the planned road in 2017 was 0.35, and in 2023, it was 0.79. Additionally, the study shows that approximately 60% of traffic movements will shift to the Karangan-Tugu road, while 40% will continue to use the existing road. Keyword: Feasibility Study, Space Optimization, Road Section Planning
Item Type: | Article |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Teknik > Prodi Teknik Sipil S1 |
Depositing User: | NR Nurul Huda |
Date Deposited: | 06 Jul 2023 09:04 |
Last Modified: | 13 Jul 2023 06:37 |
URI: | http://repository.unik-kediri.ac.id/id/eprint/579 |
Actions (login required)
View Item |