Efisiensi Waktu Pelaksanaan Pekerjaan Drainase Pada Perumahan Bmw Kepatihan Menggunakan Metode Precast

Romadhon, Romadhon (2022) Efisiensi Waktu Pelaksanaan Pekerjaan Drainase Pada Perumahan Bmw Kepatihan Menggunakan Metode Precast.

[img] Text
12. Abstrak Efisiensi Waktu Pelaksanaan Pekerjaan Drainase pada Perumahan BMW Kepatihan Menggunakan Metode Precast_Romadhon_2022.pdf

Download (25kB)
[img] Text
12. Abstrak Efisiensi Waktu Pelaksanaan Pekerjaan Drainase pada Perumahan BMW Kepatihan Menggunakan Metode Precast_Romadhon_2022.docx

Download (28kB)
[img] Text
12. BAB I.pdf
Restricted to Repository staff only

Download (13kB)
[img] Text
12. BAB I.docx
Restricted to Repository staff only

Download (15kB)

Abstract

Drainage is a residential channel used to drain excess air from places such as cities and roads. Thus, drainage generally functions as a controller for the air surface requirement to improve and reduce muddy areas, stagnant water, and flooding. On BMW Kepatihan housing old channels cannot hold water properly, causing puddles on the roads. Therefore it is necessary to build a new channel by considering the cost and implementation time. This research was conducted to analyze the method of carrying out drainage work on BMW Kepatihan housing with a channel length of 610 meters. The method used is the conventional method and the precast method. The analysis was carried out to determine the efficiency of the work in terms of cost and time, so that it is expected to be used as an alternative that can be selected in the implementation of drainage canal works. Based on the results of the time analysis of the implementation of drainage work using the precast method is more efficient than the conventional method. Implementation of drainage work using the precast method costs Rp. 727,112,000.00 and takes 120 days. While using the conventional method costs Rp. 718,400,000.00 and takes 150 days. There is a difference in costs of IDR 8,712,000.00 and 30 days of time. Keyword : Cost, Drainage, Konvensional, Precast, Time

Item Type: Article
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > Prodi Teknik Sipil S1
Depositing User: NR Nurul Huda
Date Deposited: 06 Jul 2023 10:03
Last Modified: 13 Jul 2023 06:51
URI: http://repository.unik-kediri.ac.id/id/eprint/602

Actions (login required)

View Item View Item