Analisa Percepatan Proyek Menggunakan Metode Time Cost Trade Off Dalam Meningkatkan Efisiensi Waktu Dan Biaya (Studi Kasus Proyek Renovasi UPT LLAJ Madiun)

Rahmawan, Muhammad Rifky (2023) Analisa Percepatan Proyek Menggunakan Metode Time Cost Trade Off Dalam Meningkatkan Efisiensi Waktu Dan Biaya (Studi Kasus Proyek Renovasi UPT LLAJ Madiun). Skripsi thesis, Universitas Kadiri.

[img] Text
Cover.pdf

Download (119kB)
[img] Text
Abstrak.pdf

Download (116kB)
[img] Text
Bab 1.pdf
Restricted to Repository staff only

Download (365kB)
[img] Text
Daftar Pustaka.pdf

Download (113kB)

Abstract

Work delays often occur due to differences in site conditions, changes in plans, climate impacts, and errors in project management. Project delays can be anticipated by accelerating (Time Cost Trade Off) in its implementation, however, it must remain focused on the cost factor incurred so that it is maintained. In this study, we analyzed the acceleration of the UPT LLAJ Madiun Rehabilitation project by using an alternative acceleration by adding 3 hours of overtime. The purpose of this research is to find out the difference between normal costs and time with those that have been accelerated. The total project cost under normal conditions is IDR 717,152,510 with a normal duration of 78.8 days. From the results of the acceleration research, it was found that the total cost after acceleration was IDR 793,825,425 with a duration of 75.4 days after the acceleration of the project was held or 4.3% faster than the normal duration. Keywords: Time Cost Trade Off, Delay, Project Acceleration,Duration

Item Type: Thesis (Skripsi)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > Prodi Teknik Sipil S1
Depositing User: Unnamed user with email rio.mahardiko@gmail.com
Date Deposited: 07 Aug 2023 04:01
Last Modified: 07 Aug 2023 04:01
URI: http://repository.unik-kediri.ac.id/id/eprint/649

Actions (login required)

View Item View Item