Evaluasi Penggunaan Alat Berat Terhadap Efisiensi Waktu Dan Biaya

Rahmawati, Apriliya Laily (2025) Evaluasi Penggunaan Alat Berat Terhadap Efisiensi Waktu Dan Biaya. Skripsi thesis, Universitas Kadiri.

[img] Text
01. Cover.pdf

Download (64kB)
[img] Text
02. Abstrak.pdf

Download (81kB)
[img] Text
03. Bab 1.pdf
Restricted to Repository staff only

Download (117kB)
[img] Text
04. Daftar Pustaka.pdf

Download (119kB)

Abstract

Elevation is an important aspect in construction projects, especially in areas with uneven mountainous land contours. Cut and fill work is a solution to overcome the differences in elevation. This study aims to plan the use of heavy equipment on the Probolinggo-Banyuwangi Toll Road Package 3 project in Paiton District, Probolinggo Regency. Calculations are carried out manually with productivity formulas and cost analysis to ensure that the work is carried out effectively and on time. The four planned heavy equipment are excavator buckets with a productivity of 53.85 m³/hour (4 units, Rp 993,325,475/hour), excavator breaker 18.33 m³/hour (10 units, Rp 2,676,240,000/hour), bulldozer 134.60 m³/hour (2 units, Rp 397,800,569/hour), and dump trucks 31.70 m³/hour (7 units, Rp 1,559,643,449/hour). With efficient planning, this research is expected to provide optimal contribution in the utilization of heavy equipment, especially in cut and fill work, for cost and time efficiency in toll road construction. Keywords : Heavy Equipment, Elevation, Excavation, Embankment

Item Type: Thesis (Skripsi)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > Prodi Teknik Sipil S1
Depositing User: Unnamed user with email rio.mahardiko@gmail.com
Date Deposited: 21 May 2026 03:33
Last Modified: 21 May 2026 03:33
URI: http://repository.unik-kediri.ac.id/id/eprint/1170

Actions (login required)

View Item View Item