Analisis Produktivitas Alat Berat Pada Pekerjaan Timbunan Dan Pemadatan Tanah Proyek Bandara Internasional Dhoho Kediri - Zona D Mse Wall, STA.112+200-STA. 112+280 (R5-R7)

Maulana, Mumammad Bagus (2023) Analisis Produktivitas Alat Berat Pada Pekerjaan Timbunan Dan Pemadatan Tanah Proyek Bandara Internasional Dhoho Kediri - Zona D Mse Wall, STA.112+200-STA. 112+280 (R5-R7). Skripsi thesis, Universitas Kadiri.

[img] Text
01. Cover.pdf

Download (297kB)
[img] Text
02. Abstrak.pdf

Download (305kB)
[img] Text
03. Bab 1.pdf
Restricted to Repository staff only

Download (428kB)
[img] Text
04. Daftar Pustaka.pdf

Download (293kB)

Abstract

In the work of a project that has a large scale, it has its own level of complexity, so to make it easier to work on, it can be assisted by the use of heavy equipment. This research will discuss the use of heavy equipment in the Kediri Dhoho International Airport Development Project. In order to achieve proper embankment and compaction, in the process of working on this project several heavy equipment were needed to make the process easier. Heavy equipment used has the function of digging, backfilling, spreading and compacting. This study aims to obtain the productivity of heavy equipment and also the duration of use of the heavy equipment itself. The research method used in this study is a qualitative method. From the analysis, the results obtained are the productivity level of heavy equipment, namely, for selected embankment work, Excavator is 0.00188 m3/hour with a tool usage time of 11 days, Dump Truck is 0.07047 m3/hour with a tool usage time of 3 days, Motor Grader of 7384.36 m3/hour with a tool usage duration of 3 days, a Bulldozer of 42.33 m3/hour with a tool usage duration of 5 days. Then, for compaction work, the Sheep Foot Roller is 1,028.57 with a tool usage duration of 20 days and the Vibrator Roller is 889,285.7 with a tool usage duration of 23 days, where the work volume is 145,016 m3. The conclusion obtained above is that the smallest productivity lies in the Excavator, so to meet the volume of the initial work plan with the productivity listed above, the Excavator heavy equipment will have a long time, with the above calculation notes only for one use of heavy equipment in a day. Keywords : Heavy equipment, Compaction, Productivity, Productivity of heavy equipment, Piles

Item Type: Thesis (Skripsi)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > Prodi Teknik Sipil S1
Depositing User: Unnamed user with email rio.mahardiko@gmail.com
Date Deposited: 07 Sep 2026 03:15
Last Modified: 07 Sep 2026 03:36
URI: http://repository.unik-kediri.ac.id/id/eprint/1225

Actions (login required)

View Item View Item