Rohmah, Tsalits Iluk Nailur (2020) Penerapan Metode CPM Dan PERT Pada Gedung Parkir 3 Lantai (Studi Kasus : Gedung Parkir 3 Lantai Grand Panglima Polim Kediri, Jawa Timur). Skripsi thesis, Universitas Kadiri.
Text
Halaman Awal.pdf Download (387kB) |
|
Text
Abstrak.pdf Download (93kB) |
|
Text
BAB 1.pdf Restricted to Repository staff only Download (124kB) |
|
Text
Daftar Pustaka.pdf Download (103kB) |
Abstract
The project is an activity carried out to products or services that have a specific scheduling. Scheduling is determined by the relationship between activities made very detailed and accurate. Therefor, the purpose of the final task is to know how to implement the Critical Path Method (CPM) and Program Evalution and Review Techique (PERT) in scheduling the project which originally used the Bar Chart method with a duration of 140 days and resulted a cost of Rp. 5.500.000.000. CPM is project scheduling in the form of a network and has a critical path, while PERT is a project scheduling that has 3 estimated time namely optimistic, normal, and pessimistic time. From the calculation result of this final task in using the CPM method generates a period of 105 days and provides cost after crashing in the labor increase of Rp. 5.568.464.052 and the increase of working hours (overtime) Rp. 5.603.725.490. While using the PERT method generates a period of 109 days and generates the cost after being crashing in the labor increase of Rp. 5.574.721.755 and the increase of working hours (overtime) of Rp.5.612.082.633 with a project probability of reaching the target of 84 %. Has a comparison of cost difference of Rp. 6.257.703 in the labor increase and Rp. 8,357.143 in addition to working hours. Keyword: Shcedule, CPM, PERT, and Crashing
Item Type: | Thesis (Skripsi) |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Teknik > Prodi Teknik Sipil S1 |
Depositing User: | NR Nurul Huda |
Date Deposited: | 25 Jan 2022 05:58 |
Last Modified: | 25 Jan 2022 05:58 |
URI: | http://repository.unik-kediri.ac.id/id/eprint/218 |
Actions (login required)
View Item |