Analisis Pengendalian Waktu Dan Biaya Dengan Metode Earned Value Pada Pembangunan Gedung Pkk Kel. Kenayan

Romadhon, Romadhon (2022) Analisis Pengendalian Waktu Dan Biaya Dengan Metode Earned Value Pada Pembangunan Gedung Pkk Kel. Kenayan.

[img] Text
11. Abstrak Analisis Pengendalian Waktu Dan Biaya Dengan Metode Earned Value Pada Pembangunan Gedung Pkk Kel. Kenayan Romadhon – 2022.pdf

Download (61kB)
[img] Text
11. Abstrak Analisis Pengendalian Waktu Dan Biaya Dengan Metode Earned Value Pada Pembangunan Gedung Pkk Kel. Kenayan Romadhon – 2022.docx

Download (28kB)
[img] Text
11. BAB I.pdf
Restricted to Repository staff only

Download (15kB)
[img] Text
11. BAB I.docx
Restricted to Repository staff only

Download (16kB)

Abstract

In project planning, various components are involved in it. Planning and controlling costs and time are part of the overall construction project management. The variance generated from the material in the execution of a project can affect the level of efficiency and effectiveness. The reality on the ground, the performance of construction projects in terms of cost and time aspects is not only reviewed from the actual volume produced but also based on real financing (accounting records of costs incurred during the project) on construction projects. This study aims to find out how much the delay is in the construction of the Inpatient Building at the Kenayan PKK Building and to find out how much the cost is for the construction of the Inpatient Building at the Kenayan PKK Building. Projects can be interpreted as activities that take place within a certain period of time aimed at achieving certain goals by using certain resource allocations. The method used is the value obtained. From the results of the analysis of the Inpatient Building Development project at the Kenayan PKK Building, it was obtained that the delay in time performance that occurred during the building construction in the last week obtained a Schedule Performance Index (SPI) value of 0.97%, namely the work completed was delayed from the planned schedule, the benefits of this research recommendation as an effort to control the project in terms of time and cost with a policy of fines or termination of contracts. The cost from the results of the Cost Performance Index (CPI) value analysis is 1.01%, namely the work costs less than what has been budgeted, with the BCWP value in the last week of IDR 9,384,582 . Keywords: Planning, Project Management, Earned Value, Cost and time control

Item Type: Article
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > Prodi Teknik Sipil S1
Depositing User: NR Nurul Huda
Date Deposited: 06 Jul 2023 09:53
Last Modified: 13 Jul 2023 06:50
URI: http://repository.unik-kediri.ac.id/id/eprint/601

Actions (login required)

View Item View Item