Erwanda, Niko Andika (2025) Analisa Percepatan Proyek Dengan Menggunakan Metode Shift (Studi Kasus: Proyek Pembangunan Gedung KPP Pratama Surabaya Genteng). Skripsi thesis, Universitas Kadiri.
|
Text
01.Cover.pdf Download (496kB) |
|
|
Text
02.abstrak.pdf Download (440kB) |
|
|
Text
03.bab 1.pdf Restricted to Repository staff only Download (486kB) |
|
|
Text
04.daftar pustaka.pdf Download (352kB) |
Abstract
The level of success of a project in achieving its goals can be reviewed from the aspects of time, cost and quality. The project is said to be successful when these three specifications are fulfilled according to the initial planning. In reality, it is inversely proportional to the conditions in the field which are not in accordance with the initial planning, resulting in project delays. Implementing parties usually choose to accelerate projects as a solution to delays by using the crashing method. This research aims to accelerate the KPP Pratama Building Construction project, Surabaya Genteng which is experiencing delays by using alternative work shifts. Analysis was carried out using quantitative descriptive methods. The data used is primary data taken from the interview process and secondary data in the form of documents related to the project, including the RAB, time schedule, work volume, wage unit list and also the number of workers. The calculation results show that acceleration using alternative work shifts can reduce the duration of work by 78 days or 48% of the normal duration of structured work from the normal duration of 151 days. In terms of costs for shift work, there has been an increase due to indirect costs with a total of IDR 9,947,186,249.74 or an increase of 0.0047%. The conclusion of this research is that acceleration using alternative shift work can catch up with the decline in work progress in the field of 48% but does not incur too many indirect costs of 0.0047%. Further studies can be carried out regarding the duration, costs and also the effectiveness of alternative accelerated work with shifts Keywords: Alternative Shifts, Crashing, Project Delays, Project Management.
| Item Type: | Thesis (Skripsi) |
|---|---|
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Divisions: | Fakultas Teknik > Prodi Teknik Sipil S1 |
| Depositing User: | Unnamed user with email rio.mahardiko@gmail.com |
| Date Deposited: | 10 Jul 2026 04:05 |
| Last Modified: | 10 Jul 2026 04:05 |
| URI: | http://repository.unik-kediri.ac.id/id/eprint/1210 |
Actions (login required)
![]() |
View Item |