Analisis Hubungan Antara Nilai Hasil Terhadap Waktu dalam Proyek Konstruksi Pembangunan Ruang Kelas MIN 2 Tulungagung

Ridwan, Ahmad (2021) Analisis Hubungan Antara Nilai Hasil Terhadap Waktu dalam Proyek Konstruksi Pembangunan Ruang Kelas MIN 2 Tulungagung.

[img] Text
17. Abstrak Analisis Hubungan Antara Nilai Hasil Terhadap Waktu dalam Proyek Konstruksi Pembangunan Ruang Kelas MIN 2 Tulungagung_Ahmad Ridwan_2021.pdf

Download (16kB)
[img] Text
17. Abstrak Analisis Hubungan Antara Nilai Hasil Terhadap Waktu dalam Proyek Konstruksi Pembangunan Ruang Kelas MIN 2 Tulungagung_Ahmad Ridwan_2021.docx

Download (26kB)
[img] Text
17. BAB I.pdf
Restricted to Repository staff only

Download (16kB)
[img] Text
17. BAB I.docx
Restricted to Repository staff only

Download (23kB)

Abstract

Good time control is expected to help project implementation according to the planned method, one of which is by using yield value analysis. Result value analysis is used with the aim of being able to estimate (forecasting) the extent to which the project implemented is in accordance with the work plan. The purpose of this study is to find out how the application of EVA (Earned Value Analysis) is in the estimated final project completion time for each week. The method used in this study is descriptive qualitative with a project duration of 36 weeks. This study resulted, the project completion time was not in accordance with the initial project schedule plan, in week 1 to week 12 the project was completed faster than the initial plan of the project. From the 13th to the 35th week the project experienced delays from the initial project plan and the evaluation of project performance was not good, so that the development experienced a delay in the schedule. During project implementation from week 1 to week 35 there was a difference between the planned project schedule and project implementation, and in week 13 the project completion time experienced a setback from the initial project plan, namely for 103 days, if the project implementation was not evaluated . Keywords: Construction project, time control, result value concept

Item Type: Article
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > Prodi Teknik Sipil S1
Depositing User: NR Nurul Huda
Date Deposited: 06 Jul 2023 09:37
Last Modified: 13 Jul 2023 06:44
URI: http://repository.unik-kediri.ac.id/id/eprint/593

Actions (login required)

View Item View Item